MIL-STD-790G
4.2 Validation. The qualifying activity is responsible for determining if the manufacturer meets the requirements of this standard. Validation is required as part of the qualification and retention of qualification to the individual product specification. The qualifying activity shall perform a review of the manufacturing facility as part of the validation effort. Revalidations are required to maintain qualification and shall be performed within 24 months of the last review. This validation period may be extended by the qualifying activity if the manufacturer can demonstrate adequate controls of their system through Statistical Process Control (SPC), self-assessment, Technology Review Boards (TRBs), etc.
4.3 Elements. The manufacturer shall demonstrate a system for established reliability and high reliability parts that include the specific elements as defined in the detailed requirements of this standard (see section 5).
5. DETAILED REQUIREMENTS
5.1 General. The detail requirements for meeting this standard are described in this section. It is not intended that the manufacturer create a military unique system in order to meet these requirements. Manufacturers may use existing internal systems in meeting these requirements provided they are validated by the qualifying activity.
5.1.1 Key personnel and organizations. The responsibility and authority of key personnel and organizations associated with the qualified products shall be identified. The manufacturer shall identify changes affecting in key organizations and personnel. The qualifying activity shall be informed of any changes within 30 days after such an occurrence.
5.1.2 Test facilities. The manufacturer shall identify the test facilities and equipment used for qualification and conformance inspection of the electrical, electronic, and fiber optic parts.
* 5.1.3 GIDEP alerts. The manufacturer shall notify the qualifying activity of all pending GIDEP
alerts/problem advisories prior to issuance.
* 5.1.4 Sub-assembly facilities. Qualified manufacturers validated to this standard may utilize sub- assembly facilities (contractors) to perform specific manufacturing steps in accordance with the authorized qualified manufacturer's system. The manufacturer is responsible for ensuring these sub- assembly contractors meet the requirements of this standard as applicable. The qualifying activity reserves the right to perform a validation of the sub-assembly contractor. The manufacturer is
responsible for ensuring that all parts utilized by the sub-assembly contractor meet all quality standards of the applicable specification(s). The manufacturer shall maintain a list of all sub-assembly contractors, the functions that they are authorized to perform and their unique identification. This list shall be available to the qualifying activity upon request. No additional sub-assembly contractors shall be utilized without proper and prior notification to the qualifying activity. All sub-assembly shall be in locales that are suitable
for auditing by DoD employees as determined by the qualifying activity.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business